Project gallery

Framing two bedrooms and a home office

See how Etogo laid out new rooms inside one open space. These three photos follow the framing stage of the renovation.

Before

Open room with a continuous floor and a ceiling-mounted projector.
The original room was one open space.

During

Tape lines on the floor show the planned positions of the new partition walls.
Tape on the floor marks where the new walls will go.

After framing

Timber studs and a framed doorway show the new layout before the walls are closed.
The partitions and doorway are in place. The framing is still visible before drywall covers it.

Project videos

When a high water table affects storm drainage

Look through the square grate at the end of the clip. You can see how close the water is to the surface. At this property, a high water table was interfering with storm drainage.

Before choosing a repair, we ask two questions. How high does the groundwater rise? Where can the stormwater go when it reaches that level?

Drainage diagnosis · 11 seconds

Watch Etogo project videos on YouTube

For the Etogo project team

Sign in to YouTube with an account that can upload to Etogo Property Stewardship and select @etogops. Include the project name and stage in the video title so agents can find the footage.

Upload a project video in YouTube Studio

Browse renovation photos by category